A warm supper-club dining room at golden hour — green banquettes, brass light, tables set

The operating system for opening restaurants right

The deal doesn't die at the table.
It dies in the walls.

Your space bleeds carrying costs while you guess what it can hold. We certify restaurant-readiness before the lease is signed. Lease faster. Price the TI right. Never eat a $200K surprise.

What we certify

Electrical service 400A

Gas supply BTU

Ventilation Type I

Grease Interceptor

Four systems, one verdict

Every restaurant is five things multiplied. Zero out one and the space is worth nothing.

Four systems the lease never mentions. Four a tenant's contractor will find after the LOI — from the other side of the table.

The math of a dark space

The most expensive buildout in commercial real estate, underwritten on a guess.

A 200-amp panel. No interceptor. An undersized gas line. Any one zeroes out the deal. None of them appear on the lease.

$200–500 per SF

Restaurants are the most expensive commercial buildout there is — up to 10× general retail.

40–60% of 2nd-gen projects

Hit an MEP surprise — the cost item underwriters miss most often.

$280K -class blindside

The gap a tenant's contractor finds after the LOI — from the other side of the table.

8–12 months

Concept to opening — and the space bleeds carrying costs for every one of them.

“Specialists at every node. Nobody at the interfaces. The interfaces are where projects die — so that's where we stand.”

People invest millions in restaurants blindly — who wouldn't put ten thousand in the market without an advisor. The industry calls it passion. We call it a scandal.

The seat nobody was sitting in

A broker for the space. A chef for the concept. A bank for the capital. Nobody for the walls.

The broker can't price a Type I hood. Neither can the chef. So the truth shows up last — from the tenant's contractor, after the deal is already built on a guess.

Every great room runs on one person holding all of it — the timing, the money, the mood. That's the maître d'. We made it a document, and we stand where the projects die: at the interfaces. Every great room has a Maître.

Detail of an open commercial electrical panel with clean conduit runs
Where the deal actually dies The interfaces
What the lease never mentions.

Maître Restaurant-Ready™ · Assessment & Certification

LEED, but for whether a space can hold a restaurant.

One document. Three verdicts: ready, ready with upgrades, not viable as-is. Each with the number attached. Shaped like diligence you already trust — a Phase I environmental, not "consulting."

You'd never close without a Phase I. Stop leasing kitchens without this.

MAÎTRE Open right. No. RR-0412 · 01/24

Subject property

4120 Corridor Crossing · Selma, TX

3,400 SF · Second-generation restaurant · Endcap

Ready with upgrades 72/100
Estimated cost ranges for identified gaps
Identified gapEstimated range
Electrical service upgrade — 400A$38,000 – $55,000
Type I hood & make-up air path$42,000 – $70,000
Exterior grease interceptor [F1]$28,000 – $46,000
Recommended TI allowance$108,000 – $171,000

Full engineering appendix behind tab · Prepared for the developer, readable by the lender.

Illustrative rendering. Real content, one plausible property.

The sequence

Three moves. The truth goes first.

No discovery phase. No deck. A site visit and a number you can put in a lease.

  1. 01

    Submit the space

    Address, prior use, square footage. Photos if you have them. Five minutes. No account.

  2. 02

    We assess it

    A site visit. An engineering review of the four systems that decide the deal. Then the number.

  3. 03

    You market with the truth

    List with the badge. Price the TI right. Walk into the negotiation holding engineering instead of hope.

Every assessment scores a space. Every opening teaches the next one.

“The six-figure mistakes happen before the lease is signed.”

Lease a vacant restaurant space to a tenant who survives — without over-building infrastructure you can't recoup. The six-figure mistakes happen before the lease is signed. So does Maître.

“You mastered the food. We'll hand you the rest.”

Found the space you love? Get an honest verdict you can read in one sitting — and show to your lender — before you commit your life savings.

“Unit eleven should be cheaper than unit ten. We make sure of it.”

Score your pipeline before any LOI, on an auditable basis instead of a broker's guess. Commit capital to the sites that open fastest and cheapest.

The proof

A score is engineering, not opinion.

A founder who runs rooms. A field record behind every number.

A founder who runs rooms, not decks.
Built by Daniel Trevino, who runs Box St. All Day across three San Antonio locations. Written from receipts, not research. Every step walked. Every price paid.

And the field evidence behind the score

Field evidence

An operator discovered post-lease that code required a $40,000+ exterior grease trap nobody had budgeted — and the landlord didn't know either.

Field evidence

An undersized hood or an insufficient gas line quietly erases the savings a second-generation space was supposed to hand you.

Grounded in the 2026 State of the Restaurant Industry (NRA), tenant-improvement cost trackers, and HBR's profit-pool framework. Figures are planning benchmarks that vary by market and scope.

The offer

A $25K question that answers a $280K one.

Assessment, certification, and a listing-ready one-pager. $10K–$25K per property. Priced against the mistake, not the hours.

One business day. San Antonio–Austin corridor, and expanding.

A warm marble and brass restaurant bar at amber hour

Before the ink dries

The six-figure mistakes happen before the lease is signed.

Electrical, gas, ventilation, grease — certified, scored, and priced. One document you can hand to a lender.

Open right.

Where we work

Coverage SA – Austin

Turnaround 10 days

Per property $10–25K

hello@maitre.co